Skip to content.

UPDATE FROM THE RIDGE_KITCHEN AND TRIM PROGRESSING

Entry Drive
River Side
Detail of new chimney pipe
Re-claimed wood burning stove
Hemlock Detail
Kitchen in progress

Check out the most recent pix above.

Comments (0)

Update from the Ridge_Siding and Roof Installation

south elevation
porch awaiting steel columns
drywall ready for paint
hemlock wood siding and fabral metal roof and wall panels

Despite the record temps back in DC this summer, the Ridge has a tad bit cooler.  NWC has the house roofing and siding just about complete and the interior ready for priming.  

Comments (0)

Ridge House Drawings Complete

GriD architects is excited to announce that the Ridge House construction documents have been submitted to No Worries Carpentry. Ground breaking to follow…stay tuned.

Comments (0)